STRUCTURAL and
CIVIL ENGINEERING DESIGN PROJECTS:
[an asterick denotes
projects performed by general partners prior to McKennyKrug partnership]
Click the icon
to see some cool project pictures.
(We're still working on getting pictures in here. Keep
checking back.)
Project: Stockton Main Post Office*
Client: U.S. Postal Service (1984)
Location: Stockton, CA
Engineer: RHVA/David P. McKenny
Structural System: Steel moment frame, masonry shear walls.
Principal: Gerald Haines, S.E./RHVA Consulting Engineers
Project: Power Generating Facility - Power Structure
Support Buildings*
Client: Arizona Power/Salt River Project - Springerville Generating
Station (1980-81) Location: St. Johns, Arizona
Engineer: Bechtel Power Corporation/Douglas S. Krug
Structural System: Masonry shear walls, steel substructure, concrete
grade beam on deep pile foundation
Principal: Richard J. Kosiba, S.E./Bechtel Power Corporation
Project: Single Family Residence Size:
3600 sq.ft.*
Location: Napa, CA
Engineer: David P. McKenny, C.E.
Structural System: Wood shear walls, conventional foundation
Architect: Bucher-Duvall Architects
Project: Power facility structures
- plant modifications Client: U C Operating Systems/Ultrapower (1992-1993)
Location: Lincoln, CA
Engineer: Douglas S. Krug, C.E.
Structural System: Storage silo/mat'l handling equip't design;
braced frame/moment frame; slabs on grade; steel platform framing; cylindrical
shell analysis
Manager: Bill Long/Clark Glasow, Plant Mgrs./UCOS Ultrapower
Project: State Franchise Tax
Board/ Exterior Wall System Design
Location: Sacramento, CA
Engineer: David P. McKenny, C.E.
Structural System: Cold-formed steel
Contractor: Performance Contracting, Inc.
Project: California State University
Northridge - Exterior Wall System Design
Client: Performance Contracting, Inc. (1992)
Location: Northridge, CA
Engineer: David P. McKenny, C.E.
Structural System: Cold-formed steel
Contractor: Performance Contracting, Inc.
Project: Switchgear building
modifications (12 buildings Statewide)
Client: GLUMAC, Inc/Pacific Bell
Location: Central and Northern California
Engineer: Douglas S. Krug, S.E.
Structural Systems: Concrete slabs/shear walls, masonry walls &
wood framed systems; structural retrofits
Principal: GLUMAC International
Project: Amusement/Recreational
Buildings
Client: C J Architecture and Design
Location: Cathedral City, CA, Bakersfield, CA, Modesto, CA
Engineer: David P. McKenny, C.E.
Structural System: Wood shear walls, glulam beams, panelized roof
framing
Architect: Kathy Goodwin, Architect
Project: Bridge Crossing - Federal
Waterway (90' clear span)
Client: Unger Construction
Location: Sloughhouse, CA
Engineer: Douglas S. Krug, C.E.
Structural System & other: Structural steel, concrete abutments;
bank stability and endangered species mitigation via Army Corps of Engrs.
and U.S. Fish & Wildlife/Cal F&G
Contractor: Scott Maxwell, Unger Construction
Project: McClellan AFB - Secured
Storage Facility
Client: Performance Contracting, Inc. (1992)
Location: North Highlands, CA
Engineer: David P. McKenny, C.E.
Structural System: Cold-formed steel/moment & braced frames
Contractor: Performance Contracting, Inc.
Project: Kaiser Hospital Facility
Client: Performance Contracting, Inc. (1993)
Location: Roseville, CA
Engineer: David P. McKenny, S.E.
Structural System: Cold-formed steel/moment & braced frames
Contractor: Performance Contracting, Inc.
Project: Rancho Seco Nuclear Generating
Station
Client: Sacramento Municipal Utility District (SMUD)
Location: Herald, CA
Engineer: Douglas S. Krug, S.E.
Structural System: Tapered Steel Girder Roof System; stress reanalysis
and CFR/DSAR application
Manager: Ron Lawrence, M.E./SMUD
Project: Genentech Research and
Production Facility - Exterior Wall Systems 
Client: Performance Contracting, Inc.
Location: Vacaville, CA
Engineer: David P. McKenny, S.E., Douglas S. Krug, S.E.
Structural System: Mild and cold-formed steel
Contractor: Performance Contracting, Inc.
Project: Emergency Generator
Facility - Wood substructure
Client: Mt. Shasta Mercy Medical Center
Location: Mt. Shasta, CA
Engineer: Douglas S. Krug, S.E.
Structural System: Wood framed interior substructure for equipment
support/OSHPD regulated
Principal: GLUMAC International
Project: Shriners Children's
Hospital 
Client: The Shriners
Location: Sacramento, CA
Engineer: David P. McKenny, S.E.
Structural System: Cold-formed and mild steel framed systems &
equipment support/OSHPD regulated
Contractor: Barton-Malow Company
BACK
to Projects Main Page, or
Go to Plan Review Projects
|